Sector 14 / Construction estimating

Service stations
estimating.

Construction estimating for service-station sites, separating forecourt, canopy, retail building and specialist fuel-system work.

Australia-wide service · Scope agreed before work starts
Unbranded service station canopy and forecourt with technical drawing transition
Sector illustration
A practical starting point

Define the forecourt and the specialist interfaces.

A service-station project brings civil works, a retail building, a canopy and specialist equipment into a compact site. Estimax measures the documented construction scope and identifies which items sit with the builder, civil contractor or nominated fuel-system supplier.

We support new-site construction, forecourt upgrades and existing-station refurbishments. Architectural, structural, civil and specialist layouts establish the quantity basis. Ground treatment, existing tanks and potentially contaminated material are treated against supplied reports and defined allowances, rather than assumed from the surface layout.

01 / Project types

Projects we estimate.

  • New service stations
  • Forecourt upgrades
  • Canopy replacements
  • Convenience-store buildings
  • Station refurbishments
  • Truck refuelling areas
  • Car-wash building works
  • Documented EV charging civil works
02 / What we measure

From the drawings
to the work packages.

The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.

01

Demolition & groundworks

Defined demolition, excavation, filling and ground preparation, with disposal and remediation scope based on the provided site investigations.

02

Forecourt & pavements

Concrete and asphalt areas, reinforcement, joints, kerbs, islands, drainage channels and pavement build-ups by traffic zone.

03

Canopy & structure

Foundations, steel frame, roofing, soffits and fascia work, with signage and equipment support provisions identified.

04

Retail & amenities building

Building structure, envelope, partitions, finishes, joinery, doors and sanitary facilities to the documented store brief.

05

Fuel & equipment interfaces

Tank excavation, bases, trenches, penetrations and builder's work where designed, separating specialist fuel supply and installation packages.

06

Services & site works

Electrical, hydraulic, fire and mechanical work, drainage systems, utility connections, fencing, line marking and landscaping within scope.

Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.

03 / Estimating services

PlannedMeasuredPriced

Choose the service that matches the decision you need to make and the detail available in your drawings.

01

Pre-construction cost planning

Build an early construction budget around the forecourt, canopy and store, showing ground uncertainty and specialist equipment packages separately.

  • Preliminary budgets
  • Design option comparisons
  • Design development allowances
  • Budget review notes
02

Quantity take-offs

Measure pavements, drainage, structural elements and store fit-out with clear references to the specialist and general construction drawings.

  • Measurements
  • Trade breakdowns
  • Drawing references
  • Scope and quantity notes
03

Tender estimating

Coordinate civil, building and equipment quotations, checking exclusions for trenches, connections, testing and reinstatement against the agreed scope.

  • Detailed trade pricing
  • Agreed labour & material allowances
  • Received quotation comparisons
  • Assumptions & exclusions
04 / Documentation we review

The right information.
A clearer estimate.

Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.

Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.

Site & forecourt layout
Traffic zones, equipment positions, levels and construction boundaries.
Fuel-system design
Specialist layouts, equipment schedules and supplier inclusions.
Civil & drainage drawings
Pavements, pits, channels, pipework and specified treatment systems.
Structural & building design
Canopy, foundations, store details and fit-out schedules.
Ground & existing-site reports
Survey, geotechnical and environmental information supplied by the project team.
Operator & tender brief
Signage, equipment, staging, specifications and addenda.
05 / Trade-by-trade estimating

See where the cost sits.

Maintain distinct civil, canopy, retail-building and specialist fuel packages. The interface schedule is as important as the equipment price when checking what the contractor must provide.

01

Demolition & ground preparation

02

Forecourt pavements & drainage

03

Canopy & steelwork

04

Retail building & fit-out

05

Specialist equipment interfaces

06

Utilities & external finishes

Ground conditions

What investigation and disposal information is available?

Specialist supply

Does the equipment offer include all construction interfaces?

Operating site

Are staging and isolation requirements defined by the project team?

06 / What you receive

Information you can
actually work with.

See the building and civil cost alongside the specialist equipment boundary, with ground and interface allowances explicitly recorded.

Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.

Your agreed estimating package

  • Measured quantities for the agreed scope
  • Trade-by-trade breakdown
  • Drawing and document references
  • Clear assumptions & exclusions
  • Cost breakdown for priced commissions
  • Outstanding information and allowance notes
Confirm your preferred format

Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.

07 / Who we work with

Built around your role in the project.

We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.

  • Service-station builders
  • Civil contractors
  • Developers
  • Retail construction teams
  • Specialist subcontractors
  • Project managers
08 / How it works

Simple to start.
Thorough from there.

A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.

UPLOAD YOUR DRAWINGS
01

Upload your drawings

Send the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.

02

We review the documentation

We check the available design information, document revisions and any gaps that affect what can be measured or priced.

03

Scope & quote confirmed

We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.

04

Estimating & take-off

We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.

05

Internal review

Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.

06

Estimate delivered

You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.

09 / Why Estimax

Construction thinking.
Clear documentation.

Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.

Review the detail

Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.

Keep scope visible

Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.

Work across Australia

Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.

Ready when you are

Ready to price
your next project?

Upload your drawings and project documentation and let Estimax review the scope.

TALK TO AN EXPERTView all estimating sectors