Site preparation & foundations
Site establishment, selective demolition, excavation, footings, slabs, reinforcement and formwork, with retaining structures and ground assumptions identified separately.
ESTIMAXRequest a quoteConstruction quantities, early budgets and tender estimates for homes and residential developments, organised around the way the project will be built.
Australia-wide service · Scope agreed before work starts
Estimax helps residential builders, developers and design teams understand the work behind a building budget. We review the available plans, engineering, specifications and selections to separate the structure, finishes, services and external works into identifiable packages.
For a new home, the estimate can support procurement and tender preparation. For an extension or renovation, it also needs to distinguish retained construction from demolition, alterations and new work. Early design allowances remain visible so they can be replaced with measured quantities and quoted selections as the documentation develops.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Site establishment, selective demolition, excavation, footings, slabs, reinforcement and formwork, with retaining structures and ground assumptions identified separately.
Timber framing, structural steel, masonry, roof coverings, insulation, cladding, windows and external doors, separated by type and drawing location.
Partitions, ceilings, floor and wall finishes, painting, skirtings and internal doors measured room by room, allowing for different finish selections.
Waterproofing, tiling, cabinetry, benchtops and scheduled fixtures in kitchens, laundries and bathrooms, with supply and installation boundaries recorded.
Hydraulic fixtures and pipework, electrical points, lighting and mechanical systems to the detail shown, distinguishing nominated equipment from unresolved allowances.
Driveways, paths, drainage, fences, decks and landscaping, plus common-area works and shared services for multi-unit projects.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare building form, site works and finish levels while the design is developing. Identify provisional selections and keep the budget basis clear.
Measure by dwelling, level, room or trade so a builder can request comparable supplier and subcontractor prices without losing the drawing references.
Bring measured work, agreed labour and material allowances, and received quotations into a residential tender breakdown. Highlight unresolved selections and client-supplied items.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Separate the building shell from finishes and external works, then split repeated dwellings and common areas where useful. This helps prevent shared drainage, driveways or services being missed or counted more than once.
What is retained, removed, protected or made good?
Which finishes are nominated and which remain allowances?
Are common areas included once and allocated clearly?
Use a residential estimate to compare trade prices, review selections and see which parts of the home still require a decision.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.