Lighting and controls
Match luminaire tags with the schedule, then identify switching and control components rather than counting fittings alone.
ESTIMAXRequest a quoteElectrical estimating for documented power, lighting, containment, communications and equipment connections.
REQUEST A QUOTE
Estimax prepares electrical takeoffs for electrical contractors and builders using services drawings, legends and schedules. Fittings and equipment are counted by type while documented routes and containment are measured separately. An electrical cost estimate can support tender review or package comparison when rates, specialist quotations and installation assumptions are agreed.

Match luminaire tags with the schedule, then identify switching and control components rather than counting fittings alone.
Reconcile boards, circuits and equipment connections with the issued design. Missing cable sizes or routes are raised for clarification.
Keep data, security and emergency systems in their own breakdown. Confirm whether specialist supply, programming and commissioning are included.
Quantities follow the issued drawings and the package you engage us to assess. Select the relevant work, then agree the boundaries before measurement begins.
The estimate needs a stated basis. These are the details we examine before treating two quantities as equivalent work.
Fitting selections, board requirements and control arrangements influence costs beyond the number of outlets.
Cable lengths, tray sizes, risers and congested pathways can change material and installation allowances.
Shutdowns, live-site restrictions and testing requirements need a clear scope and programme basis.
Send the latest coordinated issue and identify the tender deadline, project location and package boundaries.
Deliverables, file format and the pricing basis are confirmed in your scope. Any marked-up drawings or additional reporting are agreed before work starts.
Review legends and system boundaries
Count fittings and equipment
Trace documented routes
Check schedules and missing design information
Prepare agreed quantities and pricing
Devices are counted against the drawing legend and schedules. Cable and containment lengths are measured in linear metres where routes are shown, with vertical rises and termination allowances identified. Circuit or route assumptions are explicit when the design does not show a complete path. Board and equipment packages are separated for defined supplier scope.
Schedules organise fittings, cables, conduits, trays, boards, outlets and accessories by system and specification. Data, security and specialist controls remain distinct from general power and lighting. Product substitutions or capacity selections are not made simply to complete an estimating schedule.
Ceiling access, mounting heights, congested routes and fit-off sequencing affect installation. Existing-building shutdowns, restricted hours and staged commissioning need project-specific information. Testing, labelling and documentation allowances are included only where agreed and supported by the tender requirements.
Yes, where routes are documented or a measurement basis is agreed. Unshown routing is treated as an identified assumption, not a confirmed installed length.
No. The estimate follows the issued electrical design. Capacity, protection and compliance decisions remain with the electrical designer and licensed contractor.
Yes. We can separate these systems for specialist quotations or exclude them, according to the agreed package boundaries.
Estimax provides electrical estimating services for projects across Sydney, Melbourne, Brisbane, Perth, Adelaide, Canberra, Hobart, Darwin and Regional Australia.
Share your documentation digitally. We confirm the project location, access conditions and required delivery date so these can inform the estimating brief.
For electrical, the value is in connecting the quantities to the actual work. We keep the documented scope, measurement basis and outstanding questions available for review.
Review plans, schedules and details together. Keep drawing references with the quantities and raise conflicting information.
Separate measured work, agreed allowances and exclusions so you can assess the basis behind the estimate.
Agree the deliverables, communicate scope questions and issue documentation structured for your tender or procurement review.
Send your drawings, specifications and required date. We’ll review the information and confirm the next steps.