Site & enabling works
Demolition, site compounds, protection, fencing and temporary routes, plus earthworks and foundations for the nominated new buildings.
ESTIMAXRequest a quoteCost plans, quantities and tender estimates for learning environments, with teaching spaces, specialist rooms and campus works measured as distinct packages.
Australia-wide service · Scope agreed before work starts
Education projects combine varied room types with the practical constraints of a school or campus. Estimax reviews the issued design, room schedules, site information and staging brief to build a scope that covers the building and its connections to the wider site.
We support contractors and project teams working on new facilities, extensions and refurbishments. Estimates can be arranged by building, teaching block, trade or delivery stage. This lets clients distinguish repeatable classroom work from specialist spaces, shared services and the temporary measures needed around occupied areas.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Demolition, site compounds, protection, fencing and temporary routes, plus earthworks and foundations for the nominated new buildings.
Concrete, steel, timber, roofing, façades, glazing and weatherproofing, measured separately for new blocks and building extensions.
Partitions, ceilings, acoustic linings, flooring, painting, doors and storage by classroom type and finish schedule.
Laboratory joinery, workshop benches, library fittings, performance-space finishes and equipment connections where detailed in the design.
Power, lighting, data, hydraulic, mechanical and fire works, including documented connections and modifications to existing systems.
Covered walkways, paths, courts, landscape areas, drainage and access works, with staged reinstatement and protection recorded.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare new-build, extension and refurbishment options, separating teaching areas, specialist rooms and campus infrastructure in the early budget.
Measure by building and room type, with separate schedules for repeated classrooms and specialist spaces that carry different fit-out requirements.
Prepare trade pricing against the nominated stages and access conditions, identifying temporary work and services continuity allowances.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Arrange the estimate by building and stage as well as trade. Keep specialist teaching fit-out and campus connections visible so a classroom rate does not obscure work serving the whole site.
How will people and construction activities be separated?
Are equipment and connection requirements issued?
What existing systems need modification or extension?
Use the estimate to compare building packages, specialist room costs and staged campus works on a consistent basis.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.