Enabling & substructure
Demolition, site establishment, excavation, retaining, foundations, basements and concrete structure, with temporary works and access allowances identified.
ESTIMAXRequest a quoteA coordinated view of structure, façade, services and fit-out costs for commercial buildings, from design budgets to tender packages.
Australia-wide service · Scope agreed before work starts
Commercial projects bring several design disciplines and procurement packages together. Estimax reviews architectural, structural and services information alongside the specification to establish what belongs in each trade and where packages meet.
We support head contractors, developers and project teams with estimates for new buildings, extensions and refurbishments. The breakdown can separate base-building works, tenant areas and external infrastructure, making it easier to review subcontractor scope, compare design options and prepare a tender based on a defined document issue.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Demolition, site establishment, excavation, retaining, foundations, basements and concrete structure, with temporary works and access allowances identified.
Concrete, steel, formwork, reinforcement, glazing, façade panels, roofing and waterproofing, separated into buildable and procurable packages.
Partitions, ceilings, finishes, doors, joinery and amenities, with lobbies and circulation areas distinguished from tenancy work.
Mechanical, electrical, hydraulic and fire scope from coordinated drawings and schedules, recording builder's work and specialist supply boundaries.
Stairs, balustrades, lift-related builder's work and scheduled specialist systems, with proprietary equipment treated against supplier scope.
Access roads, car parks, footpaths, drainage, utility connections and landscaping within the nominated construction boundary.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare structural systems, façade areas and services provisions before the design is fixed, with cost allowances linked to the current design maturity.
Produce quantities by trade, floor or tenancy so procurement packages can be reviewed without losing the common-area and base-building scope.
Assemble the tender from measured packages, subcontractor information and agreed preliminaries, recording exclusions and gaps between offers.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
A commercial breakdown can follow both the construction trades and the project's tenancy structure. Separate services equipment from builder's work, and show the inclusions behind major subcontract allowances.
Who provides supports, penetrations and making good?
Where does base-building scope finish?
What access, staging and programme assumptions affect cost?
See the cost of each commercial package and the scope behind it before comparing tenders or committing to procurement.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
For each base-building or tenancy item, record its drawing reference, responsible package and any unresolved connection or finishing work. Confirm the handover boundary before comparing quotations.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.