Site & building structure
Demolition, earthworks, foundations, concrete, framing and roof structure, following the approved scope and issued engineering.
ESTIMAXRequest a quoteEstimating for early learning buildings and outdoor play environments, bringing room finishes, services and external works into one defined scope.
Australia-wide service · Scope agreed before work starts
Childcare projects combine small-scale building detail with carefully specified internal and outdoor environments. Estimax reviews room arrangements, fixtures, joinery, finishes and landscape information to identify the construction work required by the issued design.
We prepare cost plans, take-offs and tender estimates for builders, developers and early learning project teams. New centres, conversions and staged upgrades need different allowances for demolition, existing services and temporary access. Design and approval requirements remain with the project consultants; the estimate records the work documented to meet the brief.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Demolition, earthworks, foundations, concrete, framing and roof structure, following the approved scope and issued engineering.
Roofing, cladding, glazing, doors, ramps, balustrades and accessible routes shown on the design.
Partitions, acoustic treatments, ceilings, floor finishes, wall protection and painting separated by room and finish type.
Storage, kitchenette work, sanitary fixtures, nappy-change joinery and staff amenities, using the scheduled sizes and selections.
Lighting, power, hydraulic work, ventilation, heating and cooling, fire and security provisions where documented.
Play surfacing build-ups, landscape work, paths, fences, gates, drainage and shade structures, separating proprietary play equipment from installation.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare building layouts, finish selections and outdoor work packages while keeping operator requirements visible in the budget.
Measure rooms and external play zones separately, with counts for fixtures, storage and scheduled equipment interfaces.
Coordinate building and landscape trade pricing, recording nominated equipment, staged access and unresolved design selections.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Separate the building shell, internal rooms, services and outdoor learning areas. Proprietary equipment, surfacing, foundations and installation should have clear responsibility boundaries.
Who supplies and installs play items and shade structures?
Are age-group fixtures and storage selections defined?
Does the scope require staged work around an operating centre?
Review the full centre budget, including the outdoor spaces, with room-specific quantities and clearly separated specialist packages.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.