Shared substructure
Basements, excavation, retention, foundations and below-ground drainage across the agreed development boundary.
ESTIMAXRequest a quoteCost planning and trade estimating for projects combining residential, retail and commercial uses, with shared works allocated clearly.
Australia-wide service · Scope agreed before work starts
Mixed-use developments share structure and infrastructure while carrying different fit-out standards and operational requirements. Estimax separates the residential, commercial and shared portions of the project so the cost of each can be reviewed without losing the connections between them.
We work with builders, developers and consultants from early design through tender. Architectural zoning, structural information, services diagrams and tenancy briefs establish the basis of the estimate. A clear allocation of common plant, basements, podiums and public areas helps support budget decisions and procurement discussions.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Basements, excavation, retention, foundations and below-ground drainage across the agreed development boundary.
Concrete, reinforcement, formwork and steel, distinguishing podium, transfer and typical-floor construction.
Façades, roofing, glazing and balconies measured by system and building zone rather than one blended rate.
Dwelling finishes, tenancy provisions, amenities and joinery separated by use and handover condition.
Central plant, risers, distribution, metering and fire systems, with tenancy connections and builder's work identified.
Lobbies, circulation, landscaped podiums, loading areas, access roads and public-realm interfaces within the documented scope.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare the cost contribution of each use, the shared structure and the common services while design choices remain open.
Measure quantities by zone, level and trade, retaining a separate common-works schedule for shared construction.
Build a coordinated tender breakdown that identifies package overlaps, stage boundaries and the scope included in each tenancy handover.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
A two-level breakdown can group work by construction trade and by building use. This makes shared plant, structure and external works traceable without counting them in multiple tenancy packages.
How are common works shown against each use?
Is each tenancy shell-only or fully fitted?
Which infrastructure serves more than one stage?
Understand the separate cost drivers of each use while retaining one coherent estimate for the overall development.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.