Enabling & alterations
Demolition, protection, temporary access and alterations to retained buildings, separated from new permanent work.
ESTIMAXRequest a quoteClear construction quantities and cost breakdowns for public buildings, aligned with the documented scope, tender schedules and package boundaries.
Australia-wide service · Scope agreed before work starts
Public-building tenders may combine detailed specifications with prescribed pricing schedules and multiple stakeholder requirements. Estimax reviews the issued documents and organises the construction scope so quantities, allowances and exclusions can be followed back to their source.
We support contractors and project teams pricing civic facilities, administration buildings and public asset upgrades. The estimate can follow the required work breakdown, stage or building while retaining a trade view for procurement. Project-specific security, access and handover requirements are considered where they are included in the supplied brief.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Demolition, protection, temporary access and alterations to retained buildings, separated from new permanent work.
Foundations, concrete, reinforcement, formwork, steel and timber framing to the issued structural scope.
Façades, glazing, roofing, entrances, ramps, stairs and balustrades as documented by the design consultants.
Counters, partitions, ceilings, doors, finishes, joinery and sanitary amenities, separated by public-facing and staff areas.
Mechanical, electrical, hydraulic, fire, communications and specified security work, with specialist systems and builder's work distinguished.
Car parks, paths, drainage, landscape, fencing and connections to adjoining public areas within the nominated boundary.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Develop a budget by asset or functional area, recording the scope assumptions behind upgrades, new work and retained components.
Measure the construction trades and map the quantities to the nominated work sections or pricing schedule where agreed.
Coordinate trade prices and preliminaries into the tender format, with scope qualifications and unpriced information set out for client review.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Keep the procurement breakdown and the tender return structure connected. Separate defined construction work from provisional items so the client can understand what each schedule amount represents.
Does each work package appear in the return schedule?
Have the relevant addenda been incorporated?
Which existing systems and buildings remain outside the work?
Use a documented trade estimate to review a public-building tender and understand the construction scope represented in each pricing section.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.