Site preparation & earthworks
Demolition, clearing, excavation, fill and service relocations shown in the design, with temporary work areas and ground assumptions separated.
ESTIMAXRequest a quoteQuantity and cost estimating for transport facilities, including vehicle pavements, passenger infrastructure, drainage and staged civil works.
Australia-wide service · Scope agreed before work starts
Transport facilities bring vehicle movements, passenger routes and site infrastructure together. Estimax separates these work zones in the take-off so different pavement types, shelter structures, drainage systems and building elements can be reviewed and priced appropriately.
We support contractors and project teams preparing budgets and tenders for new facilities, depot works and upgrades. Civil and structural drawings are reviewed with services layouts and the staging brief. Temporary access and operating-facility restrictions are identified from the information issued, rather than blended into permanent-work quantities.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Demolition, clearing, excavation, fill and service relocations shown in the design, with temporary work areas and ground assumptions separated.
Pavement layers, reinforced slabs, asphalt, kerbs, islands and bus-bay details by vehicle zone and specified build-up.
Platforms, paths, ramps, tactile surface areas, handrails and crossing works, following the issued access design.
Canopies, structural steel, roofing, foundations, amenities and staff buildings with their associated finishes and fittings.
Pits, pipes, culverts, detention elements and utility trenches, plus documented lighting, power and communications infrastructure.
Fencing, gates, signage foundations, line marking, landscape and documented equipment interfaces, including stage-specific reinstatement.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare layout, pavement and shelter options, keeping passenger facilities and enabling works distinct in the early cost plan.
Measure by work zone and construction layer, linking pavement areas, lengths and structural quantities to the relevant sections and details.
Develop a trade breakdown reflecting the stated staging and access arrangements, with provisional utility work and specialist equipment scope identified.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Separate permanent infrastructure from temporary access and staging. Group vehicle pavements, pedestrian works and shelter packages independently so the design requirements of each remain visible.
Are different loads and build-ups separated?
What must remain accessible during construction?
Which relocations are documented and which remain provisional?
Review the transport facility as clear civil, structural and services packages, with temporary works and operating constraints visible.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.