Enabling & earthworks
Clearing, demolition, excavation, embankment, backfill and disposal quantities, with measurement boundaries and ground assumptions documented.
ESTIMAXRequest a quoteMeasured civil work packages and tender estimates for bridges, earthworks, drainage and associated infrastructure, with temporary works and site assumptions clearly identified.
Australia-wide service · Scope agreed before work starts
Civil estimates depend on levels, ground conditions, construction sequence and the interfaces between work packages. Estimax reviews the issued design, investigation information and specification to distinguish measurable permanent works from the allowances required for delivery.
We support civil contractors and infrastructure project teams with cost planning, take-offs and tender breakdowns. Bridge elements, road approaches, drainage, utilities and reinstatement can be scheduled independently. Temporary works and specialist construction methods are priced against the supplied methodology or identified as items requiring further definition.
The take-off follows the information issued for your project. Each element is separated by its type, specification and location where the documentation allows.
Clearing, demolition, excavation, embankment, backfill and disposal quantities, with measurement boundaries and ground assumptions documented.
Piles, pile caps, footings, abutments, piers, concrete, reinforcement and formwork from the issued foundation and structural details.
Girders, decks, barriers, parapets, bearings, joints and drainage, distinguishing proprietary supply from associated site work.
Pavement layers, kerbs, footpaths, approach slabs, retaining, line marking and safety-system scope shown in the design.
Pipes, culverts, pits, headwalls, channels and utility interfaces, with relocations and tie-ins separated where defined.
Specified temporary works, access, erosion controls, water-management allowances and reinstatement, linked to the nominated construction approach.
Measured quantities and provisional allowances are identified separately. Missing design information is recorded so it can be resolved rather than hidden in a total.
Choose the service that matches the decision you need to make and the detail available in your drawings.
Compare defined civil options and identify the cost sensitivity of groundworks, structures, access and temporary measures before the detailed tender stage.
Measure by structure, chainage, work zone or bill item as agreed, recording the drawing issue, quantities and assumptions used.
Build the estimate from measured work, agreed resources and specialist quotations, keeping temporary works, risk allowances and unresolved scope visible.
Send the latest coordinated set you have, together with the drawing register and known changes. We confirm what can be assessed from that issue and what needs an allowance or clarification.
Early plans are a starting point for cost planning. Detailed take-offs and tender pricing require enough design and specification information to define the work.
Use the project's work breakdown or tender schedule alongside civil trade packages. Clearly separate permanent quantities, delivery-related allowances and provisional items so the cost basis can be reviewed.
Which survey, sections and measurement rules are being used?
What temporary works and access assumptions support the price?
Which ground or utility items remain allowances?
Review civil costs against the measured work and the stated delivery assumptions, with temporary and provisional scope distinguishable from permanent construction.
Your quote sets out the agreed deliverables. A quantity-only take-off does not include a priced estimate unless pricing is part of the brief.
Tell us if you need Excel, PDF, marked-up drawings or a separate labour and material split. We confirm availability and inclusion in the scope before work starts.
We agree the scope around the packages you are responsible for, whether you are coordinating the whole project or pricing a single part of it.
A defined brief, a clear document issue and an agreed delivery date give the estimate a useful basis from the outset.
UPLOAD YOUR DRAWINGSSend the current drawings, specifications and project brief through our quote form. Include the site location and your required delivery date.
We check the available design information, document revisions and any gaps that affect what can be measured or priced.
We agree the estimating service, package boundaries, deliverables, fee and timing with you before proceeding.
We measure the agreed work, organise the trade packages and develop pricing where it forms part of the confirmed service.
Your agreed package identifies drawing references, assumptions, inclusions and allowances for your review.
You receive the agreed package with its pricing basis, assumptions and outstanding information clearly recorded.
Useful estimating connects the drawings to the way the work is procured and built. The result needs to explain its basis as clearly as it presents its quantities and costs.
Read drawings, specifications and schedules together. Keep references with the work and raise scope questions where the information does not align.
Separate trade packages, identify interfaces and state allowances. Make the construction scope behind a number available for review.
Share documentation digitally. Confirm the project location, access conditions and pricing basis so local requirements can be considered in the brief.
Upload your drawings and project documentation and let Estimax review the scope.
Help us understand whether OpenAI ads lead to enquiries. If you accept, OpenAI may match conversions using contact identifiers securely hashed in your browser. Your choice does not affect browsing or submitting an enquiry. You can change it here at any time.